laid out and ready
yes Howard S. I contemplated leaving them thrown about ready for install.0
leisurely morning strolls wan
meandering meditations will have to evolve into the days heat till fall takes hold. surely the Dopt will adapt to an abbreviated pre day's breach walks along with my long morning absence (school).0
piled high and deep (not always evident
about twenty units flung into an I-am-done-with-you pile, which stands about waist deep (4') by a tad longer than three of me stacked head to foot (18' or so).0
a slice for him; a slice for her
guess which parental unit has a birthday today!0
why is this my normal?
and it is!0
contemplating approach and access
oh well. I'll just eat them any way! kind of ten second rule but hands instead of floor.0
stop it! and hand over my art supplies
I am trying to get the work done! hand it over NOW! and no that killing of the rubber is not actually helpful just mildly entertaining as you wrastle it to death. back off!0
ummm plumbing insulation and new straps
rebar ate through three straps in 15 minutes. there is something about driving down the toll road while straps are popping and blowing freely in the wind ummm. this kind of freedom is unnerving and not mentioned in the constitution!0